순천 병원 부하 제어 PoC 프로젝트

Load control Proof of Concept project at a hospital in Suncheon, Korea

영문 원문입니다.

Company profile

Industry: Healthcare
Facility: 9-floor hospital
Energy profile: 300 AC units | 5 MW capacity
Air conditioning cost: USD 10,000 / month
Location: South Korea

The challenge

The solution: xVPP Powersight

xVPP Powersight is an advanced energy data analysis platform that provides granular monitoring, trend and cost analysis, energy resource simulation, abnormal peak detection, and AI-powered insights and recommendations.

The analysis:

The results

7%estimated total cost savings potential
10%cooling costs saved
19%cooling costs saved incl. maximum demand reduction
$20,000monthly savings simulated under solar & battery resource adoption scenario